- 7 rail tracks of 298 to 648 m length;
- Handling of up to 6 block trains per day, 2 trains simultaneously;
- RMG crane servicing rail terminal;
- Digital gates with innovative tracking system on railway inbound/outbound points;
- Direct reloading from vessel to railway and vice versa;
- Loading/unloading 24/7.